BS4568/En61386 Gi Conduit Hand Operated Bending Machine 20mm&25mm

Product Details
Customization: Available
Type: Hydraulic Pipe and Tube Bending Machine
Automation: Manual
Still deciding? Get samples of US$ 85/Piece
Request Sample
Manufacturer/Factory, Trading Company
Gold Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
1000000 RMB
Plant Area
<100 square meters
  • BS4568/En61386 Gi Conduit Hand Operated Bending Machine 20mm&25mm
  • BS4568/En61386 Gi Conduit Hand Operated Bending Machine 20mm&25mm
  • BS4568/En61386 Gi Conduit Hand Operated Bending Machine 20mm&25mm
  • BS4568/En61386 Gi Conduit Hand Operated Bending Machine 20mm&25mm
  • BS4568/En61386 Gi Conduit Hand Operated Bending Machine 20mm&25mm
  • BS4568/En61386 Gi Conduit Hand Operated Bending Machine 20mm&25mm
Find Similar Products
  • Overview
  • Product Description
  • Packaging & Shipping
Overview

Basic Info.

Model NO.
BM-2
Applicable Material
Steel
Applicable Shape
Round
Model No.
Bm-2
Material
Malleable Iron&Steel&Stainless Steel&Aluminum
Surface Treatment
Painting
Transport Package
Carton
Specification
20mm&25mm, 20mm&25mm&32mm
Trademark
AS PER REQUIRED
Origin
China
HS Code
8462299000
Production Capacity
50000PCS/Year

Product Description

Product Description

 

Product Name: Conduit Bending Machine
Size: 20MM&25MM 20MM&25MM&32MM 32MM
Pack. qty: 1 set/carton 1 set/carton 1 set/carton
Material: Malleable Iron&Steel&Stainless Steel&Aluminum
Surface treatment: Painting
BS4568/En61386 Gi Conduit Hand Operated Bending Machine 20mm&25mmBS4568/En61386 Gi Conduit Hand Operated Bending Machine 20mm&25mm
Packaging & Shipping

BS4568/En61386 Gi Conduit Hand Operated Bending Machine 20mm&25mm


FAQ

Q1. Standard of products.
A: Our products are according with BS4568, BS EN50086 and BSEN 61386.

Q2. Can you supply samples and how many time will it take?
 A: Free samples can be provided as your request. It takes around 7days to prepare samples.

Q3. Delivery time.
A: Normally it will take 35days after order confirmed for production.

Q4. Which trade term do you use?
A: FOB, CIF, CNF, EXW etc.

Q5. Which seaport do you use?
A: Tianjin, Shenzhen or Shanghai in china.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier